Color :
Customer orderLoading port :
Xiamen, ChinaPayment :
T/T, L/COrigin :
ChinaLead Time :
7-15 working daysQuick install cement silo just like building block, the whole silo can be erected piece by piece from the bottom legs to top cover easily, normally it will take 1-3 days to finish the medium size silo, capacity less 200T.
Main features of Quick install cement silos:
![]() |
Self sealing design, combine with sealing strip and outside sealant, to make sure the perfect sealing and service life. |
Flange connecting design and processing, to guarantee the quality and shorten the leading time, it will take 1-3 working days to finish installation for medium size silo. |
![]() |
![]() |
Stacking piece by piece, easy to be loaded in
container, 1 sets of 50T silo can be load in 1*20GP container |
Welding free design, all parts will be assembled by bolts and nuts, no need skill workers , can be installed fast. |
![]() |
Container loading and installation in job site of 100T bolted type cement silo:
The main technical parameter of medium size cement silo:
Capacity
Diameter
Body thickness
Bracing legs
Discharge height
Silo body height
Weight
Container loading
100T
3239mm
5/4/3mm
219*4
2m
11.5m
5.8T
2 in 1*40HQ
The General layout of Quick intall cement silos:
Address: Wanrong Road, Luojiang Area, Quanzhou, Fujian, China
Tel: 0086-18965721886;
Fax: 0086-595-22428460
Phone :
+86-18965721886Email :
wongzx@suntsing.comAddress :
Wanrong Road, Luojiang Area, Quanzhou, Fujian, ChinaSkype :
rambo-huangFriendly Links:
Copyright © Suntsing Construction Machinery Co.,Ltd..All Rights Reserved. Powered by dyyseo.com